Projects · Track record
Delivered projects.
Infrastructure we designed, built and handed over, on the client’s own hardware. Clients stay anonymous; the sizes are the real ones.
- Nodes
- 37
- CPU cores
- 4,608
- GPUs
- 41
- Storage
- 6 PB+
Totals across the seven VirtIQ projects delivered by InnoQube, 2024–2026.
2024 – 2026
Delivered by InnoQube.
-
2026 · Academic
Dedicated AI training cluster
VirtIQ K8s on bare metal · NVIDIA Run:ai
- 6 nodes
- 1,536 CPU cores
- 24× NVIDIA H200
- 3.3 TB RAM per node
- 4×100 GbE
- 500 TB+ Lenovo DG5000 storage
- 54 TB local distributed storage
Our role Design, installation, tuning and configuration, OIDC integration.
-
2026 · Finance
Out of the public cloud, onto a private platform
VirtIQ HCI · Kubernetes
- 4 nodes
- 192 CPU cores
- 1.5 TB RAM
- 200 TB+ distributed storage (object, file, block)
- 4×25 GbE · MLAG · LACP L3+4
Virtual machines, containers and S3-compatible storage on one cluster, with backup and disaster-recovery mirroring. The workloads were moved out of a public cloud.
Our role Design, installation, tuning and configuration.
-
2026 · Academic
Virtualization and storage cluster
VirtIQ HCI · Kubernetes
- 3 nodes
- 384 CPU cores
- 4.5 TB RAM
- 200 TB+ distributed storage (object, file, block)
- 250 TB+ Lenovo DG5000 storage
- 2×100 GbE · MLAG · LACP L3+4
Our role Design, installation, tuning and configuration.
-
2025 · Space sector
High-throughput object storage
VirtIQ HCI · Kubernetes
- 4 nodes
- 256 CPU cores
- 1 TB RAM
- 400 TB+ S3-compatible storage
- 4×100 GbE · MLAG · LACP L3+4
- 389 Gbps measured under load
Our role Design, installation, tuning and configuration, OIDC integration.
-
2025 · Software company
High-performance compute and storage cluster
VirtIQ HCI · Kubernetes
- 3 nodes
- 384 CPU cores
- 4.5 TB RAM
- 300 TB+ distributed storage (object, file, block)
- 4×25 GbE · MLAG · LACP L3+4
Our role Design, installation, tuning and configuration.
-
2024–2025 · Academic
Research computing platform, CPU and GPU
VirtIQ HCI
- 12 nodes
- 1,536 CPU cores
- 17× NVIDIA A40
- 18 TB RAM
- 4 PB+ distributed storage
- 25 GbE · MLAG · LACP L3+4
Two consecutive projects, configured as one platform.
Our role Design, installation, tuning and configuration, OIDC integration.
-
2024 · Earth observation · public institution
Data hub: synchronization, processing and storage
VirtIQ HCI · Kubernetes
- 5 nodes
- 320 CPU cores
- 1.2 TB RAM
- 200 TB+ S3-compatible storage
- 4×10 GbE · MLAG · LACP L3+4
Our role Design, installation, tuning and configuration, OIDC integration and S3 STS configuration. We also developed the microservices that synchronize, process and store the datasets.
2009 – 2023 · Before InnoQube
Team track record.
The engineers who founded InnoQube come from research. Since 2004 they have built and run computing infrastructure in European research projects (FP7, Horizon 2020, ESA): grid and HPC clusters first, then cloud platforms.
They have worked with OpenStack since the Juno release in 2014, first installed by hand and then with deployment tools they wrote themselves, and with upstream Kubernetes since 2017. Automated, repeatable deployment has been the constant, including doctoral research on deployment services for cloud environments.
The systems below were delivered or operated before the company was established in 2023.
-
2022–2023 · Academic
Private cloud for a new modular data center
OpenStack · Kubernetes
- 2,048 CPU cores
- 16 TB RAM
- 250 TB+ distributed storage
- 2×25 GbE · MLAG · LACP L3+4
End-to-end virtualization and observability, deployed in one click with minimal manual steps.
-
2019–2020 · Space sector
CPU and GPU cluster on enterprise hardware
OpenStack · Kubernetes
- 400 CPU cores
- GPU accelerators
- 130 TB+ distributed storage
- 2×10 GbE
- 4×16 Gb Fibre Channel
The cloud platform was integrated with HPE 3PAR storage and HPE Synergy compute and networking, for industrial-grade high availability.
-
2019 · Academic · HPC
POWER9 GPU nodes with a parallel file system
IBM Power System AC922 · IBM Spectrum Scale
- 2 nodes
- 320 POWER9 cores
- 8× NVIDIA V100
- 1 PB parallel file system
The team’s role System administration and operation.
-
2012 · Academic · HPC
GPU cluster for a European research project (FP7)
x86 · NVIDIA Tesla
- 7 GPU nodes
- 7× NVIDIA Tesla M2070Q
- 18 TB storage
The team’s role System administration and operation.
-
2011 · Academic · HPC
BlueGene/P supercomputer
IBM BlueGene/P
- 1 rack
- 4,096 PowerPC cores
- 4 TB memory
- 11.7 TFlops sustained
- 15 TB SAN storage
The team’s role System administration and operation.
-
2009 · Academic · HPC
Grid computing cluster
IBM BladeCenter-H
- 448 Xeon cores
- 1 GB RAM per core
The team’s role System administration and operation.
Next step
Tell us what you’re building.
A platform to deploy, an application to build or a system to modernize: describe it in a few lines and an engineer will answer.
Start a project